Transmission Line Infrastructure (Power Lines)

  • Home
  • Project Categories
  • Transmission Line Infrastructure (Power Lines)

Renovation/Restoration of Towers

Renovation of Towers Back Client: Corpoelec Some of our projects in this area. Restoration of Tower T427 on the 115-kV Los Pijiguaos–Puerto Ayacucho and Puerto Nuevo–Puerto Ayacucho transmission lines, and installation of crossarms on the 115-kV Los Pijiguaos – Puerto Ayacucho, Cabruta – Caícara – Los Pijiguaos, and San Gerónimo…

Relocation/Replacement of Towers

Relocation of Towers Back Client: Corpoelec Some of our projects in this area. Relocation of towers 372–373, double circuit, 230 kV Barinas IV–Acarigua II, to mitigate the risk of collapse. Relocation and replacement of towers on the 115-kV San Fernando I–Gorrín single-circuit triple-conductor line, located between the states of Apure…

Electrical Circuits

Circuit Construction in Substations Back Client: Corpoelec Some of our projects in this area. Construction of the circuits associated with the new 115 kV Biscucuy substation (Cerro Saguaz–Biscucuy–Palo Alzao–San José at 13.8 kV) and the 34.5 kV Chabasquen feeder, and Las Cruces, and retrofitting of the 34.5/13.8 kV Chabasquen substation…

Categories

  • No categories

Recent Posts

Cart (0 items)